|
关注:1
2013-05-23 12:21
求翻译:The extraction of river bed materials will be planned properly in such a way that river morphology does not change after the removal of the materials. Further, during the extraction of materials, due consideration will be given to minimize bank erosion.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The extraction of river bed materials will be planned properly in such a way that river morphology does not change after the removal of the materials. Further, during the extraction of materials, due consideration will be given to minimize bank erosion.
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
提取的河床的材料将计划的正确方式 , 河流的形态并不更改删除后的材料。 另外 , 在抽取的材料 , 将适当考虑到尽量减少银行的侵蚀。
|
|
2013-05-23 12:24:58
河床材料的提取将适当地计划,在这种情况下河形态学不在材料的撤除以后改变。 进一步,在材料的提取期间,交付考虑将被给予使银行侵蚀减到最小。
|
|
2013-05-23 12:26:38
河床料的提取将妥善计划在以后清除这些材料不会改变河流形态的一种。此外,材料,提取过程中适当考虑尽量减少银行侵蚀。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区