当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The cost allocation model of "two vertical and longitudinal" is established. Referring to domestic and international experience, a bank based on actual data, based on data availability and peripheral system data support level, comprehensive consideration of product pricing, performance evaluation, resource allocation a是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The cost allocation model of "two vertical and longitudinal" is established. Referring to domestic and international experience, a bank based on actual data, based on data availability and peripheral system data support level, comprehensive consideration of product pricing, performance evaluation, resource allocation a
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
成本分配模型的 “两个垂向和纵向” 是成立的。
  • 匿名
2013-05-23 12:24:58
成本分摊模型“二垂直和纵向”建立。 参见国内和国际经验,根据实际数据的银行,根据数据可用性和周边系统数据支持率,全面产品定价的考虑,表现评估、资源分配和业务发展战略,为了遇见重要性、一贯性和可行性原则,设定了四个水平管理会计系统: 6,等级32,等级三,等级103, 278,四和二。 运用国内和外国卓著的列出的银行,形成“二水平和垂直,垂直和水平的经验,报道三农村”共担花费模型。 建立一个全面经营计划作为预算管理系统的核心和测试水部门预算控制。 采取联合经营计划作为载体,一套的最初的创立责任跟踪反馈系统的预算实施。 在实施能遵守绝对索引,并且相关索引分析和用途、控制和定时控制任何时候以结合的,
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭