|
关注:1
2013-05-23 12:21
求翻译:1.编制作业指导书,明确钻孔所用工具,并在首件确认孔位是否满足。是什么意思?![]() ![]() 1.编制作业指导书,明确钻孔所用工具,并在首件确认孔位是否满足。
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
1. The preparation work instructions, clear drilling tool used in the first part, and confirm that the holes are met.
|
|
2013-05-23 12:24:58
1. establishment work instruction book, is clear about the drill hole to use the tool, and in first confirmed whether Kong Wei does satisfy.
|
|
2013-05-23 12:26:38
1. preparation of work instruction, expressly drilling tools, and make sure the hole is to meet.
|
|
2013-05-23 12:28:18
null
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区