当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Construction cost control system not sound, any a items engineering its cost costs are occurred in all construction link in the, prior on may cost lack estimated, control not strict no developed contracting cost costs index, in implementation operation in the, on hard do idea; costing system not perfect, in highway sec是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Construction cost control system not sound, any a items engineering its cost costs are occurred in all construction link in the, prior on may cost lack estimated, control not strict no developed contracting cost costs index, in implementation operation in the, on hard do idea; costing system not perfect, in highway sec
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
建筑; 解释; 建筑物
  • 匿名
2013-05-23 12:24:58
建筑费控制系统不酣然,任何设计它的费用费用的项目在所有建筑链接在发生,预先也许花费估计的缺乏,控制不严密没有被开发的收缩的费用成本指数,在实施操作,在艰苦做想法; costing system not perfect, in highway sector in the costing work often have not to enough of attention, engineering plans, and financial personnel business quality uneven, developed of accounting approach enough syste
  • 匿名
2013-05-23 12:26:38
中,事先的工程造价控制体系不健全,任何工程的成本费用项目发生在所有施工环节上可能成本缺乏估计,控制不严格,没有发达国家承包成本费用指标,在执行操作中,在努力做的理念;成本核算系统不完善,公路部门的成本核算工作中常常得不到足够的关注,工程计划及财务人员业务素质不均匀、 发达国家的会计方法不够系统和完整;评估制度不严格,成本控制结果应通过了考试,并在实践中,评价提供更大的灵活性,不足,导致不一致,影响人民群众的积极性。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭