当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:In this annex examples of test set ups for EMC tests are given. Real test set ups should be created accordingly and described in the test report (see 6.1). These test set ups are based on twisted pair cabled systems. To create test set ups for power line and wireless system, make reference to the relevant product stand是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In this annex examples of test set ups for EMC tests are given. Real test set ups should be created accordingly and described in the test report (see 6.1). These test set ups are based on twisted pair cabled systems. To create test set ups for power line and wireless system, make reference to the relevant product stand
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
本附件的例子的测试设置ups的EMC测试是给定的。 真正的测试设置ups应相应地创建和中所述的测试报告(见6.1)。 这些测试设置ups是基于双绞线电缆连接的系统。 要创建的测试设置UPS的电源线路和无线系统,可参考有关的产品标准。
  • 匿名
2013-05-23 12:24:58
In this annex examples of test set ups for EMC tests are given. 真正的测试集合上升应该相应地创造,并且描述在实验报告 (看见6.1)。 这些测试集合上升根据双铰线被缚住的系统。 要创造测试集合为输电线上升,并且无线系统,做参考给相关的产品标准。
  • 匿名
2013-05-23 12:26:38
在这个附件的测试集的例子 ups EMC 测试给出。真正的考验套 ups 应相应地创建和测试中所述报告 (见 6.1)。Ups 基于这些测试集双绞线电缆系统。若要创建测试集 ups 电源线和无线系统,请参考相关的产品标准。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭