当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Does the supplier have a documented First Piece Approval process to ensure all Evenflo products are manufactured according to requirements specified in the control plan, machine set-up, and correct parameter setting? The Procedure requires First Piece Approval at the beginning of each shift or production run and after 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Does the supplier have a documented First Piece Approval process to ensure all Evenflo products are manufactured according to requirements specified in the control plan, machine set-up, and correct parameter setting? The Procedure requires First Piece Approval at the beginning of each shift or production run and after
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
供应商有记录的第一块审批流程,确保所有的Evenflo产品生产根据需求指定在控制计划、机器设置、和正确的参数设置吗? 该过程需要一件批准在每次轮班开始时或生产运行和进行任何配置更改后的生产工艺(第4.5节)
  • 匿名
2013-05-23 12:24:58
供应商是否有一个被提供的第一个片断审批流程保证所有Evenflo产品根据在控制计划、机器设定和正确参量设置指定的要求是制作的? 做法在每转移或生产运行初要求第一片断认同,并且,在所有变动做对生产过程 (第4.5.5部分之后)
  • 匿名
2013-05-23 12:26:38
供应商是否有记录的第一件批准过程,以确保所有 Evenflo 产品都按控制计划、 机器设置和正确的参数设置中指定的要求?此过程要求第一件批准开头的每个班次或生产运行和生产流程 (4.5.5) 进行任何更改后
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭