|
关注:1
2013-05-23 12:21
求翻译:The Lot 2 Contractor shall install his steel bearing plates in the concrete foundations and install the distributors prior to embedding. Information on forces from the distributor acting on the concrete foundation shall be provided by the Lot 2 Contractor to the Lot 1 Contractor.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The Lot 2 Contractor shall install his steel bearing plates in the concrete foundations and install the distributors prior to embedding. Information on forces from the distributor acting on the concrete foundation shall be provided by the Lot 2 Contractor to the Lot 1 Contractor.
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
“很多2承包商应安装他的钢制轴承板的具体的基础和安装分销商之前的嵌入。 有关部队从分销商代理具体的基金会提供的很多2承包商的很多1的承包商。
|
|
2013-05-23 12:24:58
全部2承包商在具体基础将安装他的钢垫板并且在埋置之前安装经销商。 信息关于力量从行动在具体基础的经销商将由全部2对的承包商提供全部1承包商。
|
|
2013-05-23 12:26:38
很多 2 承包商应安装他的钢支座板在混凝土基础,并安装在嵌入之前分销商。部队从分发服务器代理的水泥地基上的信息应由多 2 承包商向多 1 承包商。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区