当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:因於同一機台投產, 排程分別於前、後批次進行加工組裝 , 因前批加工完成後遺留少許11.9mm Nut零件 , 致使後批生產11.0 Nut 產品時混淆誤用 .??(附圖 A)是什么意思?

待解决 悬赏分:1 - 离问题结束还有
因於同一機台投產, 排程分別於前、後批次進行加工組裝 , 因前批加工完成後遺留少許11.9mm Nut零件 , 致使後批生產11.0 Nut 產品時混淆誤用 .??(附圖 A)
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
With the same unit production, schedule in front and rear batch process assembly, because the batch process is complete left little 11.9mm nut part, quickly and batch production 11.0 nut product confusion misuse .? ? (Figure A)
  • 匿名
2013-05-23 12:24:58
Because in the identical radio station production, arranges the regulation separately to carry on the processing assembly in the before and after raid, after because front a batch of processing completes leaves behind little 11.9mm the Nut components, after the cause the batch produces time 11.0 Nut
  • 匿名
2013-05-23 12:26:38
Put into production in the same machine, scheduled respectively before and after batch processing and Assembly when former little 11.9mm Nut parts left over after batch processing is complete, resulting in production after 11.0 Nut products is confusing misuse.?? (Figure a)
  • 匿名
2013-05-23 12:28:18
null
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭