当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:partition of them into batches ,and a choice of the job(andbatch) delivery dates. Accordingly, to describe and manipulate a solution, which in the ICA terminology is named as country, amatrix with 4 rows and N columns is employed in ICADP.Assume that all the jobs are numbered from1 to N, by considering firstly the jobs是什么意思?

待解决 悬赏分:1 - 离问题结束还有
partition of them into batches ,and a choice of the job(andbatch) delivery dates. Accordingly, to describe and manipulate a solution, which in the ICA terminology is named as country, amatrix with 4 rows and N columns is employed in ICADP.Assume that all the jobs are numbered from1 to N, by considering firstly the jobs
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
分区的批次,选择和作业andbatch)交货日期。 因此,在描述和操作的解决方案,在ICA的术语被命名为国家、与amatrix 4行和N列的是受雇于ICADP。假设所有的作业编号为从1到N的考虑第一作业的客户1,然后将这些客户的2、很快的前行,然后matrixis是置换的编号从1到N,从而表明处理的作业顺序。
  • 匿名
2013-05-23 12:24:58
分开他们入批和工作andbatch交货日期的() 选择。 相应地,描述和操作解答,在ICA术语被命名作为国家, amatrix与4列和N专栏在ICADP.Assume被使用所有工作被编号from1到N,通过首先考虑工作顾客2的顾客1,然后那些和很快。matrixis的第一列然后数字from1to N的变更,因而表明工作的处理命令。 机器的太阳被强迫的懒惰允许,单独作业序列不能representa日程表,并且因而,这些矩阵的condrow, astring实数,被使用确定工作完成时代。 清楚地,为解答是可行的,日程表repre-由前二列sented必须满足限制 (2) 和 (3)。
  • 匿名
2013-05-23 12:26:38
他们划分为批次,并选择 job(andbatch) 交货日期。因此,描述和操作一个解决方案,其中在 ICA 术语中称为作为国家,和有效性具有 4 行和 N 列被受雇于 ICADP。假定所有的工作由首先考虑工作的客户 1,然后那些客户 2,编号 from1 到 N,并很快。第一行的矩阵然后排列数字 from1to N,从而指示工作处理顺序。允许强迫懒惰机太阳、 单独作业序列不能想必时间表,也因此,采用这些 condrow 矩阵,涩的实数,确定工作的完成时间。显然,对于一个可行的解决方案,附表代表发言 — — 进行的前两行必须满足约束 (2) 及 (3)。
  • 匿名
2013-05-23 12:28:18
null
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭