当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:This document will specify the general requirements for the design features, hardware, software, performance, validation, services and documentation required to the vendor of Distributed Control System (DCS). Any discrepancies or conflicts between specification and vendor bid documentation must be brought to the attent是什么意思?

待解决 悬赏分:1 - 离问题结束还有
This document will specify the general requirements for the design features, hardware, software, performance, validation, services and documentation required to the vendor of Distributed Control System (DCS). Any discrepancies or conflicts between specification and vendor bid documentation must be brought to the attent
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭