当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:a certificate of inspection and test results that state the heat , billet , or product analysis and applicable physical properties of representative samples shall be forwarded to: touchstone,Inc,. "Attn: Quality control department" at the recipient plant. it is preferred that the certification be submitted with or prio是什么意思?

待解决 悬赏分:1 - 离问题结束还有
a certificate of inspection and test results that state the heat , billet , or product analysis and applicable physical properties of representative samples shall be forwarded to: touchstone,Inc,. "Attn: Quality control department" at the recipient plant. it is preferred that the certification be submitted with or prio
问题补充:

  • 匿名
2013-05-23 12:21:38
应送交该国的热量,钢坯,或产品分析和适用的物理性质,化学性质,有代表性的样品检验和试验的结果证明:试金石,INC。 “经办人:”收件人厂的质量控制部门。它是首选的认证或装运前提交,但在任何情况下不迟于装运后7天。
  • 匿名
2013-05-23 12:23:18
一个证书的检查和测试结果,国家的热、钢坯、或产品分析和适用的物理特性具有代表性的抽样应转交给:试金石Inc._______________ “联系人:质量控制部门”在受援厂。 这是可取的,应提交核证与或在装运前,但在任何情况下不得迟於装运后七天。
  • 匿名
2013-05-23 12:24:58
陈述热检查的证明和测试结果,宿营或者产品分析和代表性抽样可适用的有形资产将批转对: 试金石,公司。 “Attn : 质量管理部门"在接收植物。 它更喜欢证明递交与或在发货之前,但决不更晚比七天在发货以后。
  • 匿名
2013-05-23 12:26:38
热、 钢坯、 或产品分析的检验和试验结果的证书和适用的物理属性的代表性的样本须送交: 试金石、 公司。"联系人: 质量控制部"收件人的工厂。这是首选认证提交或之前,出货,但在任何情况下迟交货后的七天。
  • 匿名
2013-05-23 12:28:18
热、 钢坯、 或产品分析的检验和试验结果的证书和适用的物理属性的代表性的样本须送交: 试金石、 公司。"联系人: 质量控制部"收件人的工厂。这是首选认证提交或之前,出货,但在任何情况下迟交货后的七天。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭