当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Main Contractor shall be responsible for covering and protecting and casing up and accepting full responsibility for the loss or damage of the Sub-Contract works which have been fully, finally and properly incorporated into the permanent works and including all goods and materials properly brought to and stored wit是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Main Contractor shall be responsible for covering and protecting and casing up and accepting full responsibility for the loss or damage of the Sub-Contract works which have been fully, finally and properly incorporated into the permanent works and including all goods and materials properly brought to and stored wit
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
主要承包商应负责涵盖和保护和壳体和接受全部责任的损失或损坏的分包合同的工程,已充分、最后和适当纳入永久性工程,包括所有的货物和材料正确地提到并存储在站点列入施工工程是否包括在任何临时证书包括维持和平并纠正所有必要的联合及其记录。
  • 匿名
2013-05-23 12:24:58
主要承包商将负责对覆盖物和保护和装入和承担对充分地是,最后和适当地合并到永久工作和包括在站点之内和材料里适当地被带来和被存放的所有物品为包括在转包工作转包工作的损失或损伤的充分的责任是否包括在所有临时证书包括保留和矫正所有必要的联接记录得因此。
  • 匿名
2013-05-23 12:26:38
主要的承包商应负责覆盖并保护和起套管和接受全部责任的损失或损害的分包合同工作已经充分,最后和适当纳入永久工程和包括所有的货物和材料提请并存储在分包合同工作列入网站内,不论列入包括保持和纠正所有必要的联合记录及其任何临时证书。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭