求翻译:包括混凝土找坡、排水明沟、排水管、新增雨水井、外场混凝土道路等满足Links变配电设施不进水要求及场地排水、进场道路、开关站施工过程中修复部分要求的所有工作内容。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
包括混凝土找坡、排水明沟、排水管、新增雨水井、外场混凝土道路等满足Links变配电设施不进水要求及场地排水、进场道路、开关站施工过程中修复部分要求的所有工作内容。
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
Include concrete slope, drainage rippedup roadway find, drains, new rain wells, out-concrete roads meet links transformation and distribution facilities without water requirements and Site drainage, road, switching station comes into play the construction process are all the requirements of the repa
|
|
2013-05-23 12:24:58
Looks for the slope, the draining water open ditch, the discharge pipe, the additional rain water well, the outfield concrete road including the concrete and so on satisfies Links to change the power distribution facility not to enter the water request and location draining water, the approach path,
|
|
2013-05-23 12:26:38
Including concrete slope, drainage ditch, drain, add new water wells, outfield concrete roads meet, such as Links to change distribution facilities not water requirements and site drainage, access roads and switching stations in the course of construction of the pieces all work requested.
|
|
2013-05-23 12:28:18