当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:When large-scale construction is performed on screw pile foundations, no earthmoving is required, and frost insulation can be avoided by rotating the screw pile helix below the frost line. There is no need to worry about casting and curing times when using screw pile foundations. Installation does not cause vibration o是什么意思?

待解决 悬赏分:1 - 离问题结束还有
When large-scale construction is performed on screw pile foundations, no earthmoving is required, and frost insulation can be avoided by rotating the screw pile helix below the frost line. There is no need to worry about casting and curing times when using screw pile foundations. Installation does not cause vibration o
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
当大规模的建设上执行螺杆桩基础、没有土方是必需的、和霜冻隔热材料可以避免旋转螺杆桩helix下面霜行。 没有任何需要担心的铸件和固化时间使用螺杆桩地基。 安装不会导致振动或噪音污染、站点保持清洁,基础都是快速的准备。
  • 匿名
2013-05-23 12:24:58
当大规模建筑在螺丝堆基础时进行,没有需要earthmoving,并且霜绝缘材料可以通过转动螺丝堆螺旋避免在冻深线之下。 当使用螺丝堆基础时,没有需要担心铸件和治愈时间。 设施不导致振动或噪音污染,站点停留干净,并且基础迅速准备。
  • 匿名
2013-05-23 12:26:38
当大规模的建设在螺杆桩基础上进行的时没有挖掘土方是必需的和霜绝缘可以避免通过旋转螺杆桩螺旋霜线以下。没有必要担心铸造和固化时间时使用螺杆桩基础。安装不会导致振动或噪音污染、 的网站停留,清洁,和基础迅速准备。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭