求翻译:The thickener underflow discharge will be split into two arms of the impoundment, the Shur River arm and the Gowd-e-Ahmar arm. There will be no requirement for underflow pumping. Design beach slopes are 1.75% at the head of the beach but are flatter farther down where the discharge into the two arms can be expected to 是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The thickener underflow discharge will be split into two arms of the impoundment, the Shur River arm and the Gowd-e-Ahmar arm. There will be no requirement for underflow pumping. Design beach slopes are 1.75% at the head of the beach but are flatter farther down where the discharge into the two arms can be expected to
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
该增稠剂下溢的放电将被分割成两个武器的没收、珥河的臂和Gowd的艾哈迈尔手臂。 将没有要求下溢的泵。 设计海滩斜坡的1.75%在头的海滩但越平缓越远的地方排放入两个武器可以预期在联合收割机上。 水的恢复是通过浮桥安装泵在西北角的没收。
|
|
2013-05-23 12:24:58
浓化剂暗流放电将被分裂成扣留、Shur河胳膊和Gowd-e-Ahmar胳膊的二条胳膊。 将没有暗流抽的要求。 设计海滩倾斜是1.75%在海滩的头,但是奉承者在下放电到二条胳膊里可以期望结合的地方。 水补救是由浮船登上的泵浦在扣留的西北角落。 虽然被预言的海滩倾斜是适度的,从最后的头海滩的距离向补救池塘是大约10公里。
|
|
2013-05-23 12:26:38
增稠剂暗流放电将分成两个武器的蓄水、 前的书珥河手臂和 Gowd-e-艾哈迈尔的胳膊。会没有要求下溢抽油机。设计海滩斜坡在海滩团长 1.75%但奉承深处,而排入两臂可以预计相结合。水恢复是蓄水的通过浮桥安装泵在西北角。虽然预测的海滩斜坡是适度的从最后的头的海滩到恢复池塘距离约 10 公里。
|
|