求翻译:我公司承担的全厂BOP区域全厂外管架基础承台基本施工完毕,现场面临基坑要进行全面回填土工作,如果已施工的基础不进行回填土工作,将影响整个地下管网的施工。现场原来所挖的土质基本上是砂性土,不能满足回填土的质量要求,我们将采取如下措施来保证回填土的质量。是什么意思?![]() ![]() 我公司承担的全厂BOP区域全厂外管架基础承台基本施工完毕,现场面临基坑要进行全面回填土工作,如果已施工的基础不进行回填土工作,将影响整个地下管网的施工。现场原来所挖的土质基本上是砂性土,不能满足回填土的质量要求,我们将采取如下措施来保证回填土的质量。
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
My Company's plant-wide area is full BOP pipe architecture based on the basic Taiwan construction has been completed, and the on-site facing pit to conduct a comprehensive back fill work, if you have the basis of construction not to carry out the work back fill, will affect the whole of underground
|
|
2013-05-23 12:24:58
Our company undertakes outside the entire factory BOP region entire factory the pipe support foundation receives the Taiwan basic construction to finish, the scene must carry on the comprehensive backfill faced with the hole excavated for building foundation earthwork to do, if has constructed the f
|
|
2013-05-23 12:26:38
Company plant BOP area outside the plant after construction of pipe Foundation platform, facing works backfill Foundation to conduct a comprehensive, if you have backfill is not the basis for the construction of the work, will affect the whole construction of underground pipe network. Field-dug soil
|
|