求翻译:Frequently, the most important consideration is the overall cost of the structure. This is, of course, a function of the costs(费用函数)of the materials and the labor necessary to erect them. Frequently, however, the overall cost is affected as much or more by the overall construction time since the contractor and owner mu是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Frequently, the most important consideration is the overall cost of the structure. This is, of course, a function of the costs(费用函数)of the materials and the labor necessary to erect them. Frequently, however, the overall cost is affected as much or more by the overall construction time since the contractor and owner mu
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
经常地,最重要的是整体的成本结构。 当然,这是一项功能的成本市费用函数之材料和劳工必要竖立。 不过,总的成本是受影响的尽可能多的或更多的整体施工时间由于承包商和业主必须分配一定的资金进行建设,将不会获得的在这方面的投资(收回投资公司直到建筑是准备入住。
  • 匿名
2013-05-23 12:24:58
频繁地,最重要的考虑是结构的总成本。 当然,这是费用(费用函数)的作用的材料和劳方必要架设他们。 频繁地,然而,总成本影响一样或更多在整体建筑时间以前从承包商和所有者在这种投资(收回投资)必须分配金钱执行建筑,并且不会接受回归,直到大厦准备好居住。 结果,财政储款由于迅速建筑可以更比抵销(足以抵消)增加的物质费用。 所有措施设计师能采取规范化设计,并且形成在减少的总成本一般将付清
  • 匿名
2013-05-23 12:26:38
通常情况下,最重要的考虑因素是结构的整体成本。当然,这是成本 (费用函数) 材料和劳动力直立他们所需的功能。通常情况下,然而,整体成本影响一样多或更由整体施工时间以来承包商和所有者必须拨出资金进行建设,将不会收到此投资 (收回投资) 的回报,直到建筑是准备入住。因此,快速施工的财政节余可能比 (足以抵消) 的偏移量增加的材料费用。任何措施设计器可以采取标准化设计和成形将一般还清在减少总体成本
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 