|
关注:1
2013-05-23 12:21
求翻译:The adaptability of various geological conditions, construction simple, easy operation and equipment investment is generally not great, so in all types of housing and civil construction has been widely used, but the construction of bored piles is carried out in the water, the construction process can not be observed, t是什么意思?![]() ![]() The adaptability of various geological conditions, construction simple, easy operation and equipment investment is generally not great, so in all types of housing and civil construction has been widely used, but the construction of bored piles is carried out in the water, the construction process can not be observed, t
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
适应各种不同的地质条件、施工简单、操作方便、设备投资通常不是巨大的,所以在所有类型的房屋和土木建筑已被广泛使用,但该建筑的钻孔桩进行水、施工过程可以不遵守,堆不被接受,所以它是最容易出现质量问题的工程,任何链接的问题,将直接影响到质量和进度的整个项目。
|
|
2013-05-23 12:24:58
各种各样的地质情况、建筑简单,容易的操作和设备投资的伸缩性一般不是伟大的,因此在住房和民用建筑的所有类型用途广泛,但乏味堆的建筑在水中被执行,建筑过程不可能被观察,堆不可能被接受,因此它是最易受的质量问题,所有链接问题的建筑,直接地影响整体项目的质量和进展。
|
|
2013-05-23 12:26:38
不同地质条件的适应性,施工简单,易操作和设备投资一般是不大,所以在所有类型的房屋和民用建筑中已被广泛应用,但在水中进行钻孔灌注桩施工,施工过程不能被观测,桩不能接受,所以它是最容易出现质量问题建筑的任何链接的问题,将直接影响整个项目的进度与质量。
|
|
2013-05-23 12:28:18
null
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区