当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:As the name suggests itself, the WBM roads are such roads, in which crushed stone is kept bonded by the action of rolling and voids filled with screening, and binding materials with the help of water WBM base course may be laid on a prepared subgrade, subbase, base or existing pavement as the case may be. Binding ac是什么意思?

待解决 悬赏分:1 - 离问题结束还有
As the name suggests itself, the WBM roads are such roads, in which crushed stone is kept bonded by the action of rolling and voids filled with screening, and binding materials with the help of water WBM base course may be laid on a prepared subgrade, subbase, base or existing pavement as the case may be. Binding ac
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
顾名思义,作为本身的WBM-3000系列道路是这样的道路,碎石不断保税的行动的滚动和裂缝的填补与甄别、和具有约束力的材料的帮助下,水基WBM-3000系列课程可能会放在准备好的,subgrade subbase、基座或现有的行人路。 绑定操作的施工WBM-3000系列是通过使用石灰尘作为填料,水的存在。
  • 匿名
2013-05-23 12:24:58
因为名字建议自己, WBM路是这样路,击碎石头由辗压和空隙行动保持保税充满掩护,并且粘合材料在水WBM基本的路线帮助下在准备的路基,副基层,基本或者现有的路面也许如可能被放置。 约束行动在WBM建筑通过使用石尘土获得 作为补白,在水面前。
  • 匿名
2013-05-23 12:26:38
顾名思义本身,WBM 的道路是这样的道路,在哪个碎石备的轧制和空隙充满行动保税筛选,和胶凝材料与水 WBM 基层的帮助可能铺设准备的路基、 底基层、 基地或现有路面视情况而定。WBM 建设中的带头作用,被通过使用石粉作为填料,水。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭