|
关注:1
2013-05-23 12:21
求翻译:Electric Mobile Gantry Crane in the chiller area of the Central PlantThe Contractor is referred to the Specifications and Drawings for all details related to this section of the Works and he is to include for complying with all the requirements contained therein, whether or not they are specifically mentioned within t是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Electric Mobile Gantry Crane in the chiller area of the Central PlantThe Contractor is referred to the Specifications and Drawings for all details related to this section of the Works and he is to include for complying with all the requirements contained therein, whether or not they are specifically mentioned within t
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
电动移动式起重机在冷却区的中心承建商PlantThe是提到的规格和图纸相关的所有详细信息此部分的作品和他的包括遵守其中所载的所有要求,不论他们是专门提到该项目的说明。
|
|
2013-05-23 12:24:58
电流动桥式起重机在中央PlantThe承包商的更加寒冷的区域提到规格,并且图画为全部详述相关对工作的这个部分,并且他将为依从包括从容的所有要求在其中,是否他们在产品说明之内具体地被提及
|
|
2013-05-23 12:26:38
电动移动门式起重机中央 PlantThe 承包商冷水区指说明书和图纸,与该部分工程相关的所有细节,他是包括遵守其中所载的所有规定,不论他们具体提到内物料描述
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区