|
关注:1
2013-05-23 12:21
求翻译:施工机械和电气设备不得超负荷运转,各种电动机具必须按规定接零接地,要防雨防潮防冻,下班时拉闸;是什么意思? 待解决
悬赏分:1
- 离问题结束还有
施工机械和电气设备不得超负荷运转,各种电动机具必须按规定接零接地,要防雨防潮防冻,下班时拉闸;
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
Construction of mechanical and electrical equipment must not be overburdened, various motor must be obtained in a zeroing of the ground, to rain moisture, when pulling antifreeze gates;
|
|
2013-05-23 12:24:58
The construction machinery and the electrical equipment do not have the overloading operations, each kind of electrically operated machines and tools to have to meet the zero earth according to the stipulation, wants rainproof moisture-proof frostproof, gets off work when pulls the floodgate;
|
|
2013-05-23 12:26:38
Construction machinery and electrical equipment shall not be overloaded, all kinds of motors with required neutral ground, rain moisture-proof antifreeze, quitting time switch;
|
|
2013-05-23 12:28:18
null
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区