|
关注:1
2013-05-23 12:21
求翻译:IRR decision rule: First, determine the required rate of return for a given project. This is usually the firm’s cost of capital. Note that the required rate of return may be higher or lower than the firm’s cost of capital to adjust for differences between project risk and the firm’s average project risk. If IRR>the req是什么意思? 待解决
悬赏分:1
- 离问题结束还有
IRR decision rule: First, determine the required rate of return for a given project. This is usually the firm’s cost of capital. Note that the required rate of return may be higher or lower than the firm’s cost of capital to adjust for differences between project risk and the firm’s average project risk. If IRR>the req
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
内部收益率决定的规则:第一,确定所需的回报率对于给定的项目。 这通常是公司的资本成本。 请注意,所需的回报率可能会高于或低于该公司的资本成本的调整之间的差异项目的风险和公司的项目平均风险。 如果IRR>所需的回报率、接受项目如果内部回报率
|
|
2013-05-23 12:24:58
IRR决定基准: 首先,确定必需的回报率为一个特定项目。 这通常是公司的集资费用。 注意必需的回报率也许是高或更低比公司的集资费用调整为在项目风险和公司的平均项目风险之间的区别。 如果IRR>the要求回报率,接受项目,如果IRR
|
|
2013-05-23 12:26:38
IRR 决策规则: 第一,确定所需的为一个给定的项目回报率。这通常是资本的该公司成本。请注意,要求的收益率可能高于或低于该公司的资本成本的项目风险和公司的项目平均风险之间的差别作出调整。如果 IRR > 要求的回报率,接受该项目如果内部收益率
|
|
2013-05-23 12:28:18
null
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区