|
关注:1
2013-05-23 12:21
求翻译:The ST Plant equipment mandatory inspection almost has been completed, include the inspection of safety valve and critical instruments. And the comprehensive inspection of the rest storage tank, has changed with the acoustic emission inspection, inspection situation as follows:是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The ST Plant equipment mandatory inspection almost has been completed, include the inspection of safety valve and critical instruments. And the comprehensive inspection of the rest storage tank, has changed with the acoustic emission inspection, inspection situation as follows:
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区