当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Electrical control wiring between the receiver and main control panel shall be done in a professional manner and shall be placed in a cable tray. Make sure that all wires compensate for a height difference of 1 meter between low and high point. When installing please make sure in which position the machine is, to a是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Electrical control wiring between the receiver and main control panel shall be done in a professional manner and shall be placed in a cable tray. Make sure that all wires compensate for a height difference of 1 meter between low and high point. When installing please make sure in which position the machine is, to a
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
电气控制线路接收器和主控制面板应以专业的方式和应放置在电缆盘。请确保所有导线补偿有高度差1米的低和高点。 安装时请确保在哪个位置的机器,以避免切割电缆和软管的短。
  • 匿名
2013-05-23 12:24:58
电子控制接线在接收器和主控制盘区之间在缆绳盘子完成以专业方式,并且安置。 切记所有导线补尝1米高度区别在低和高峰之间。 当请安装确定在时哪个位置机器是,避免切口缆绳和水喉到短小。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭