|
关注:1
2013-05-23 12:21
求翻译:In carries on the simulation to the power source module in the middle of the process, discovered the debugging the value of exports cannot satisfy the design throughout the request, looked up in the principle mistake in the platoon to discover afterwards originally has not carried on the hypothesis to the transformer c是什么意思? 待解决
悬赏分:1
- 离问题结束还有
In carries on the simulation to the power source module in the middle of the process, discovered the debugging the value of exports cannot satisfy the design throughout the request, looked up in the principle mistake in the platoon to discover afterwards originally has not carried on the hypothesis to the transformer c
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
在进行模拟电源模块中的过程、发现的调试,出口值不能满足该设计在整个请求的原则错误的排到后来才发觉原来并没有进行假设的变压器线圈数量的绕组后,终于建立了线圈的数量的绕组取得预期的结果。
|
|
2013-05-23 12:24:58
在排继续模仿到电源模块在过程中间,被发现出口的价值不可能满足设计在请求中的调试,查找在原则差错之后发现最初未继续假说到绕的变压器卷数量,在最后建立了绕的卷数量得到了被期望的结果之后
|
|
2013-05-23 12:26:38
在进行电源模块在过程的模拟,发现调试的出口值不能满足设计在整个请求,看在排发现的原则错误之后最初不进行假说对变压器线圈匝数的最后建立了线圈数目后绕组取得了预期的结果
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区