|
关注:1
2013-05-23 12:21
求翻译:安装数控弯箍机必须做混泥土基础,其平面不得超过正负5是什么意思? 待解决
悬赏分:1
- 离问题结束还有
安装数控弯箍机必须做混泥土基础,其平面不得超过正负5
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
Install elbow against the CNC must do concrete base with its plane shall not exceed 5
|
|
2013-05-23 12:24:58
Installs the numerical control curved band machine to have to be used as the concrete basis, its plane does not have to surpass positive and negative 5
|
|
2013-05-23 12:26:38
Installation of CNC bending machine concrete foundation must be done, the plane must not exceed plus or minus 5
|
|
2013-05-23 12:28:18
null
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区