求翻译:中标的BOP区域全厂外管架基础及短柱已全部完成,地下管网工程E5、S1、S4亦已完成钢筋混凝土管道铺设工程,其余未铺设管道因榆林地区质监站要求砼管道厂家停工(现因平均气温远低于冬季施工停工工要求),以及生产区砼合格供应商金源、榆佳已停工,所以其余砼管道及砼工程停工。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
中标的BOP区域全厂外管架基础及短柱已全部完成,地下管网工程E5、S1、S4亦已完成钢筋混凝土管道铺设工程,其余未铺设管道因榆林地区质监站要求砼管道厂家停工(现因平均气温远低于冬季施工停工工要求),以及生产区砼合格供应商金源、榆佳已停工,所以其余砼管道及砼工程停工。
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
The BOP regional plant-wide basis and frame tube short columns have all been completed, the network of underground piping engineering E5, S1, S4, has also been completed and concrete pipeline laying works on other not laying pipelines to tame the quality monitoring station requirements on behalf of
|
|
2013-05-23 12:24:58
Is selected outside the BOP region entire factory the pipe support foundation and the short stump have completed completely, underground utilities project E5, S1, S4 have also completed the reinforced concrete pipelining project, (because because other pipe leak the Yulin area quality monitoring sta
|
|
2013-05-23 12:26:38
Bid of BOP regional plant outside tube frame based and the short column has all completed, underground tube network engineering E5, and S1, and S4 also has completed reinforced concrete pipeline laying engineering, remaining not laying pipeline for Yulin quality prison station requirements concrete
|
|
2013-05-23 12:28:18