求翻译:2) During excavation of trenches, a part of excavated soil shall be reserved for backfilling, and the rest shall be removed to spoil area so as not to influence construction. Edge of slope angle of soil mound shall be at least 40cm away from trench or pit edge.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
2) During excavation of trenches, a part of excavated soil shall be reserved for backfilling, and the rest shall be removed to spoil area so as not to influence construction. Edge of slope angle of soil mound shall be at least 40cm away from trench or pit edge.
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
2)*在挖掘战壕,一部分挖掘土壤应保留用于回填,其余须移至宠区,以便不影响施工。 边坡角的土壤在投手踏板应至少40 cm的距离沟或坑的边缘。
|
|
2013-05-23 12:24:58
2) 在沟槽的挖掘期间,被挖掘的土壤的部分为重新填没将是后备的,并且将取消休息损坏区域至于不影响建筑。 土壤土墩倾斜角度边缘将是至少40cm从沟槽或坑边缘。
|
|
2013-05-23 12:26:38
2) 开挖战壕,挖掘出的土壤的一部分应预留作回填,及其他应予以取消,弃渣场,以免影响施工。边坡角的土冢应沟槽或基坑边缘距离至少 40 厘米。
|
|
2013-05-23 12:28:18