当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Reclamation works shall be carried out at the landside terminal encompassing an area of about 250,000m2. The storage area shall be backfilled to a level of approximately +5.5m CD. The areas earmarked for buldings shall be surcharged by extra height of filling to compensate the expected settlement and the total area is 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Reclamation works shall be carried out at the landside terminal encompassing an area of about 250,000m2. The storage area shall be backfilled to a level of approximately +5.5m CD. The areas earmarked for buldings shall be surcharged by extra height of filling to compensate the expected settlement and the total area is
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
填海工程须在犁体侧板端子涵盖的面积约有250,000m 2。 存储区域应撤走的约到+5.5dbm m光盘。 该区专门用于外墙或建筑物外墙应保险金额以超高的填充以补偿预期的解决和总面积约38,000m 2。 预制构件垂直排水管可能需要加快整合过程的软土在地面改造的附加费的预载
  • 匿名
2013-05-23 12:24:58
开垦工作将被执行在大约包含250,000m2的区域landside终端。 贮存区将被重新填没对近似地+5.5m CD的水平。 为buldings特别制定的区域将由补偿期望的解决的额外高度填装额外索费,并且总面积是关于38,000m2。 Prefabricated垂直的流失也许是需要的加速软的土壤的合并流程在地面改善期间通过额外费预先输入
  • 匿名
2013-05-23 12:26:38
应涵盖面积约 250 万平方米的陆域码头进行填海工程。存储区应回填到一个水平的大约 + 5.5 m CD。用于建筑物的领域应加盖由额外的高度的灌装后补偿预期的和解,总占地面积约 38 万平方米。预制竖向排水井可能需要在地面改进加速软土固结过程的堆载预压
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭