当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Areas earmarked for buildings with total area of about 38,000m2 shall be treated by surcharge preloading with prefabricated vertical drains. The required degree of consolidation and residual settlement due to primary settlement shall be achieved before the surcharge fill is removed.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Areas earmarked for buildings with total area of about 38,000m2 shall be treated by surcharge preloading with prefabricated vertical drains. The required degree of consolidation and residual settlement due to primary settlement shall be achieved before the surcharge fill is removed.
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
地区专门用于建筑物总面积约38,000m 2应视为附加的预加载使用预制构件垂直排水管。 所需的整合程度和残留的解决由于主要解决应前实现附加填充已被拆除。
  • 匿名
2013-05-23 12:24:58
为大厦特别制定的区域以38,000m2总面积将由额外费大约对待预先输入与prefabricated垂直的流失。 在去除之前,必需的程度实变和残余的解决由于主要解决将达到额外费积土。
  • 匿名
2013-05-23 12:26:38
用于建筑物总面积约 38,000 m 2 的地区应当经堆载预压预制竖向排水井。附加费填充中删除之前,应取得所需的整合和主要解决残余沉降程度。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭