求翻译:The coal and clinker storage area is to be backfilled to the design level without improvement works for the subsoil layer. The soft soil layer is to be consolidated by the weight of coal and clinker stockpiles during operation. A programme regarding the operation of the storage area shall be established to keep the loc是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The coal and clinker storage area is to be backfilled to the design level without improvement works for the subsoil layer. The soft soil layer is to be consolidated by the weight of coal and clinker stockpiles during operation. A programme regarding the operation of the storage area shall be established to keep the loc
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
煤炭和熟料存储区域是以撤走的设计水平而不进行改善工程的底土层。 软土层要整合的重量的煤和熟料储存操作过程中。 程序运作的存储区域应保持稳定的地面上。 存储区域应堆积阶段防止接地故障。
  • 匿名
2013-05-23 12:24:58
煤炭和粉煤渣贮存区将被重新填没对设计水平没有改善工作为底土层数。 软的土壤层数将由重量煤炭和粉煤渣库存巩固在操作期间。 一个节目关于贮存区的操作将建立保留地面的地方稳定。 贮存区一阶段一阶段将被堆防止地面失败。
  • 匿名
2013-05-23 12:26:38
煤和熟料的存储区域是被回填到没有土层的改善工程的设计水平。软土地层是在操作过程中要合并的煤和熟料储存重量。应制订关于存储区的行动方案,保持局部稳定的地面。存储区应堆积阶段分期以防止接地故障。