当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:At areas earmarked for buildings and treated by surcharge preloading with vertical drains, the subsoil shall achieve 95% of primary consolidation and the residual settlement due to primary consolidation shall not exceed 10cm是什么意思?

待解决 悬赏分:1 - 离问题结束还有
At areas earmarked for buildings and treated by surcharge preloading with vertical drains, the subsoil shall achieve 95% of primary consolidation and the residual settlement due to primary consolidation shall not exceed 10cm
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
在指定的地区的建筑物和对待附加费的预加载与垂直排水管、底土应达到95%的小学整合和残留的解决由于主整合不应超过10厘米
  • 匿名
2013-05-23 12:24:58
At areas earmarked for buildings and treated by surcharge preloading with vertical drains, the subsoil shall achieve 95% of primary consolidation and the residual settlement due to primary consolidation shall not exceed 10cm
  • 匿名
2013-05-23 12:26:38
在领域专门用于建筑和竖向排水井软基处理,底土应达到 95%的主固结和剩余主固结沉降不得超过 10 厘米
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭