|
关注:1
2013-05-23 12:21
求翻译:开班前确认剥离力符合标准,首件确认后方可生产。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
开班前确认剥离力符合标准,首件确认后方可生产。
问题补充: |
|
2013-05-23 12:21:38
Peel strength before opening the standard confirmation, confirmed before the first piece of production.
|
|
2013-05-23 12:23:18
Before classes recognized adhesion consistent with the standards, first piece production confirmation.
|
|
2013-05-23 12:24:58
Front starts work confirmed the peeling strength conforms to the standard, after the first confirmation only then produces.
|
|
2013-05-23 12:26:38
Confirm before opening stripping force to meet the standard first to confirm before production.
|
|
2013-05-23 12:28:18
Confirm before opening stripping force to meet the standard first to confirm before production.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区