|
关注:1
2013-05-23 12:21
求翻译:另外,工程场区浅部粉土层及人工堆积层中具有赋存台地潜水的条件,勘察期间虽未能揭露该层地下水,但地下水控制设计时仍应于考虑,本次设计考虑采用预留泄水孔方案对可能存在的台地潜水进行预处理。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
另外,工程场区浅部粉土层及人工堆积层中具有赋存台地潜水的条件,勘察期间虽未能揭露该层地下水,但地下水控制设计时仍应于考虑,本次设计考虑采用预留泄水孔方案对可能存在的台地潜水进行预处理。
问题补充: |
|
2013-05-23 12:21:38
In addition, the project site area shallow powder and artificial layers of soil occurrence in the platform diving with the conditions, although during the investigation failed to reveal the level of groundwater, but groundwater control in the design should consider, consider this design reserved Scu
|
|
2013-05-23 12:23:18
In addition, the sites of shallow powder layer and artificial layers, divers have endowed the tableland conditions during inspections, though it may not reveal the groundwater level, but groundwater control design, it remains to be taken into account in the design, consider using reserved scupper pr
|
|
2013-05-23 12:24:58
Moreover, although in the project field area shallow silt-seam and the artificial accumulative stratum has the tax saves the Taiwan place diving the condition, reconnaissance period has not been able to expose this ground water, when ground water control design still should in the consideration, thi
|
|
2013-05-23 12:26:38
In addition, the engineering field in shallow part of powder soil and artificially stacked layers with hosting platform diving conditions, although during the investigation failed to reveal that the groundwater, but still should be considered when groundwater control design, this design considered r
|
|
2013-05-23 12:28:18
, Powder engineering field in shallow soil and artificially stacked layers with occurrence in ground conditions of diving, survey does not reveal during the groundwater, groundwater control design should consider when, this design considered using reserved in every programme to preprocess Mesa dive
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区