当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:深圳地铁二号线建设引入了SCADA,EMplus-S,可编程控制器等模块化电器设备是什么意思?

待解决 悬赏分:1 - 离问题结束还有
深圳地铁二号线建设引入了SCADA,EMplus-S,可编程控制器等模块化电器设备
问题补充:

  • 匿名
2013-05-23 12:21:38
Shenzhen Metro Line construction introduced SCADA, EMplus-S, Modular programmable controller and other electrical equipment
  • 匿名
2013-05-23 12:23:18
Shenzhen Metro Line No. 2 building, EMplus - S SCADA was introduced, such as programmable controller Modular electrical equipment
  • 匿名
2013-05-23 12:24:58
The Shenzhen subway two line constructions has introduced SCADA, EMplus-S, modular electric appliance equipment and so on programmable controller
  • 匿名
2013-05-23 12:26:38
Construction of Shenzhen Metro Line 2 line introduced the SCADA,EMplus-S, modular electrical devices such as programmable controllers
  • 匿名
2013-05-23 12:28:18
Construction of Shenzhen Metro Line 2 line introduced the SCADA,EMplus-S, modular electrical devices such as programmable controllers
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭