当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:高速公路为线形构筑物,线路长,施工周期长,对环境的影响范围广、影响时间长是什么意思?

待解决 悬赏分:1 - 离问题结束还有
高速公路为线形构筑物,线路长,施工周期长,对环境的影响范围广、影响时间长
问题补充:

  • 匿名
2013-05-23 12:21:38
Highway for the linear structures, long lines, long construction period, the environmental impact of a wide range of effects for a long time
  • 匿名
2013-05-23 12:23:18
Long lines for linear structures, highway construction, long cycle and the impact on the environment covers a broad scope, impact a long time
  • 匿名
2013-05-23 12:24:58
The highway is the linear construction, the line is long, the construction cycle is long, to environment influence scope broad, influence time long
  • 匿名
2013-05-23 12:26:38
Expressway to linear structures, long line, long construction period, affected an extensive area, impact on the environment for a long time
  • 匿名
2013-05-23 12:28:18
Expressway to linear structures, long line, long construction period, affected an extensive area, impact on the environment for a long time
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭