求翻译:室外给水及消防、喷淋管道及试压完成100% 完成;室内喷淋、给排水、风口安装配合装潢施工。;配合装潢吊顶、瓷砖部分电器尾项工作。;室内配合装潢灯具安装。;外总体配合道路施工完成埋地灯管线预埋。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
室外给水及消防、喷淋管道及试压完成100% 完成;室内喷淋、给排水、风口安装配合装潢施工。;配合装潢吊顶、瓷砖部分电器尾项工作。;室内配合装潢灯具安装。;外总体配合道路施工完成埋地灯管线预埋。
问题补充:

  • 匿名
2013-05-23 12:21:38
Outdoor water supply and fire protection, sprinkler piping and pressure test to complete 100% complete; indoor spraying, drainage, installation of air with the interior construction. ; With the interior ceiling, tile part of the electrical end of tasks. ; Interior decorating with lamps installed. ;
  • 匿名
2013-05-23 12:23:18
Outdoor to water and fire and spray piping and pressure test completed 100 percent complete; indoor spraying, water, air vents with decorating construction installation. Decorating; tie in with suspended ceiling, tile part electrical Mei. Tie; Indoor decorating lighting fixture installation. Road co
  • 匿名
2013-05-23 12:24:58
The outside for the water and the fire prevention, sprays the pipeline and the hydrostatic testing completes 100% to complete; In the room sprays, gives draining water, the gusty area installment coordination decoration construction.; Coordinate decoration suspended ceiling, ceramic tile partial ele
  • 匿名
2013-05-23 12:26:38
Outdoor water supply and fire protection, spray pipes and the pressure test 100% complete; indoor spraying, water supply and drainage, air outlet installed fit decoration construction. ; Line with decoration of ceiling, ceramic tile section electrical work. ; Indoor decoration lighting installation.
  • 匿名
2013-05-23 12:28:18
Outdoor water supply and fire protection, spray pipes and the pressure test 100% complete; indoor spraying, water supply and drainage, air outlet installed fit decoration construction. ; Line with decoration of ceiling, ceramic tile section electrical work. ; Indoor decoration lighting installation.
 
 