当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:由计算可知,该矿井突水风险率为0.55,即发生突水的可能性为55%,且突水风险度为0.68,说明突水风险是比较大的。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
由计算可知,该矿井突水风险率为0.55,即发生突水的可能性为55%,且突水风险度为0.68,说明突水风险是比较大的。
问题补充:

  • 匿名
2013-05-23 12:21:38
From the calculation shows that the mine water inrush risk was 0.55, which happened suddenly the possibility of 55% water, and the degree of risk of water inrush 0.68, indicating that the risk of sudden water is relatively large.
  • 匿名
2013-05-23 12:23:18
We can see that, by calculating the mine shafts and water risk rate, i.e. , 0.55 for the possibility that water and water, and 55% risk is 0.68 on a fairly large and water-related risks.
  • 匿名
2013-05-23 12:24:58
May know by the computation, this mine pit flooding risk rate is 0.55, namely has the flooding possibility is 55%, also the flooding risk is 0.68, the showing flooding risk is quite big.
  • 匿名
2013-05-23 12:26:38
Calculation, this mine water inrush risk rate of 0.55, namely water inrush possibility is 55% and water inrush risk 0.68, shows that water inrush risk is larger.
  • 匿名
2013-05-23 12:28:18
By calculation, the mine water inrush risk rate was 0.55 per cent, that the likelihood of water is 55%, and water inrush risk 0.68, description of water risks are relatively large.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭