|
关注:1
2013-05-23 12:21
求翻译:A manufacturer producing in this category has a product that is either in the first stage of the life-cycle curve or a complex product with a unique design produced in single-digit quantities. examples of ETO include construction industry products (bridge chemical plants,automotive production lines) and large products 是什么意思? 待解决
悬赏分:1
- 离问题结束还有
A manufacturer producing in this category has a product that is either in the first stage of the life-cycle curve or a complex product with a unique design produced in single-digit quantities. examples of ETO include construction industry products (bridge chemical plants,automotive production lines) and large products
问题补充: |
|
2013-05-23 12:21:38
在这个类别的一个制造商生产的产品,要么是在第一阶段的生命周期曲线或单位的数量产生了独特的设计复杂的产品。电子交易条例“的例子包括建造业产品(桥化工厂,汽车生产线),并与固定(商业客运飞机,船舶,高压开关设备,蒸汽涡轮机)在生产过程中的特殊选项大的产品。,由于产品的性质,客户愿意接受长期的生产准备时间,因为在工程设计过程的一部分。
|
|
2013-05-23 12:23:18
一个制造商生产的这类都有产品或是在第一阶段的生命周期曲线或一个复杂的产品有一个独特的设计制作了一位数量。
|
|
2013-05-23 12:24:58
生产在这个类别的制造商有在初级生命周期曲线或一个复杂产品以在唯一数字数量导致的一个独特的设计的一个产品。 ETO的例子包括建筑业产品(桥梁化工工厂,汽车生产线),并且大产品以在生产的特殊选择(商业客机、船、高压互换机,蒸汽机)期间是固定式.due对产品的本质,顾客是愿意接受久制造业前置时间,因为工程设计是过程的一部分。
|
|
2013-05-23 12:26:38
制造商生产此类别中有一种产品,正在进行中的第一阶段的生命周期曲线或一位数批量生产具有独特设计一个复杂的产品。电子交易条例 》 的例子包括建筑行业产品 (桥化学植物,汽车生产线) 和大型产品在生产 (商业客运飞机、 船舶、 高压开关设备、 蒸汽涡轮机).due 的产品,客户的性质是固定的特殊选项是愿意接受长制造铅时间,因为工程设计过程的一部分。
|
|
2013-05-23 12:28:18
制造商生产此类别中有一种产品,正在进行中的第一阶段的生命周期曲线或一位数批量生产具有独特设计一个复杂的产品。电子交易条例 》 的例子包括建筑行业产品 (桥化学植物,汽车生产线) 和大型产品在生产 (商业客运飞机、 船舶、 高压开关设备、 蒸汽涡轮机).due 的产品,客户的性质是固定的特殊选项是愿意接受长制造铅时间,因为工程设计过程的一部分。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区