当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:西气东输二线西段工程实现供气,南水北调工程建设加快推进。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
西气东输二线西段工程实现供气,南水北调工程建设加快推进。
问题补充:

  • 匿名
2013-05-23 12:21:38
Western section of Second West-East gas project implementation, to accelerate the construction of water diversion project.
  • 匿名
2013-05-23 12:23:18
gas from the west to the east 2 western line to supply gas works, south-to-north water diversion project accelerating.
  • 匿名
2013-05-23 12:24:58
The transport the natural gas from the west to the east two west section project realization air feed, the divert water from the south to the north project construction speeds up the advancement.
  • 匿名
2013-05-23 12:26:38
Western section of the West-East gas transmission line engineering realization of gas supply, speeding up the construction of South-North water transfer project.
  • 匿名
2013-05-23 12:28:18
Western section of the West-East gas transmission line engineering realization of gas supply, speeding up the construction of South-North water transfer project.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭