|
关注:1
2013-05-23 12:21
求翻译:1. 原材料检验项目具体划分为Ⅰ、Ⅱ、Ⅲ三个类别,其中Ⅰ为必检项目、Ⅱ为抽检项目、Ⅲ表示不检验或不具备检验条件。抽检项目的分析频次由生产与检验部门协调后确定。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
1. 原材料检验项目具体划分为Ⅰ、Ⅱ、Ⅲ三个类别,其中Ⅰ为必检项目、Ⅱ为抽检项目、Ⅲ表示不检验或不具备检验条件。抽检项目的分析频次由生产与检验部门协调后确定。
问题补充: |
|
2013-05-23 12:21:38
1 project specific testing of raw materials into Ⅰ, Ⅱ, Ⅲ three categories, which will review the project for the Ⅰ, Ⅱ for the sampling project, Ⅲ said they did not test or do not have the test conditions. Sampling frequency by the project's analysis of the production and inspection department of coo
|
|
2013-05-23 12:23:18
* Items tested raw materials for specific delineation I II , , I III 3 categories, which is a must for seized items, II sampling project, III said no examination or test conditions do not exist. sampling frequency analysis of the project from production and Inspection Department identified after coo
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
1. raw materials testing project is divided into three category ⅰ, ⅱ, ⅲ, ⅰ must check items, for sampling project ⅱ and ⅲ said does not test or does not meet the test requirements. Analysis on the frequency of the sampling project coordinated by the production and inspection departments determined.
|
|
2013-05-23 12:28:18
1. raw materials testing project is divided into three category ⅰ, ⅱ, ⅲ, ⅰ must check items, for sampling project ⅱ and ⅲ said does not test or does not meet the test requirements. Analysis on the frequency of the sampling project coordinated by the production and inspection departments determined.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区