当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:项目描述:皖能合肥项目是四方公司第二次全面应用评分考核系统,尤其是在大机组600MW,现场环境复杂,故障处理困难的情况保证评分系统正确运转,用户给予了积极的评价。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
项目描述:皖能合肥项目是四方公司第二次全面应用评分考核系统,尤其是在大机组600MW,现场环境复杂,故障处理困难的情况保证评分系统正确运转,用户给予了积极的评价。
问题补充:

  • 匿名
2013-05-23 12:21:38
Project Description: Anhui Hefei project to the Quartet's second comprehensive assessment of the application score system, especially in large units 600MW, on-site complex, failure to deal with difficult situations scoring system to ensure proper operation, the user gave a positive evaluation.
  • 匿名
2013-05-23 12:23:18
Project Description: wenergy Hefei project company for the first 4 to 2 times the overall application performance rating system, and particularly in the large crew 600 MW failure, on-site environmental complex, deal with difficult situations ensure correct functioning scoring system, the user has gi
  • 匿名
2013-05-23 12:24:58
Project description: Anhui can the Hefei project be the square company second comprehensive application grading inspection system, in big unit 600MW, the scene environment is in particular complex, the breakdown processing difficult situation guarantee grading system correct revolution, the user has
  • 匿名
2013-05-23 12:26:38
Project Description: Anhui Hefei project was square company comprehensive application scoring for the second time measurement system, especially in large unit 600MW, spot is complex scoring system troubleshooting for difficult situations to ensure correct operation, the user gave a positive evaluati
  • 匿名
2013-05-23 12:28:18
Project Description: Anhui Hefei project was square company comprehensive application scoring for the second time measurement system, especially in large unit 600MW, spot is complex scoring system troubleshooting for difficult situations to ensure correct operation, the user gave a positive evaluati
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭