|
关注:1
2013-05-23 12:21
求翻译:这是一款的量产的模具费,不是一块模具,如果仅仅是一块模具,日产量会很低,生产周期会很长,耗费人工也很多。我之前有向我的老板申请过,所以我们已经承担了一部分的模具费,所以这是一款的模具费,四款总共是804是什么意思? 待解决
悬赏分:1
- 离问题结束还有
这是一款的量产的模具费,不是一块模具,如果仅仅是一块模具,日产量会很低,生产周期会很长,耗费人工也很多。我之前有向我的老板申请过,所以我们已经承担了一部分的模具费,所以这是一款的模具费,四款总共是804
问题补充: |
|
2013-05-23 12:21:38
This is a mass-produced mold fee, not a mold, if only one mold, daily output will be low, the production cycle will be very long, labor-intensive lot. Before I apply to my boss too, so we have to bear part of the mold charges, so this is a mold charges, four a total of 804
|
|
2013-05-23 12:23:18
This is a section for the production of molds, mold, and is not a piece if it were only one piece mold, 26,774 will be very low, the production cycle is very long, time-consuming manual a lot. Before I have to apply for my boss, so we have assumed a part of the mold fee, so this is a mold fee is a t
|
|
2013-05-23 12:24:58
This is the mold expense which a section quantity produces, is not together the mold, if is merely together the mold, the daily output can be very low, the production cycle can be very long, the consumption artificial very are also many.In front of me has has applied to mine boss, therefore we have
|
|
2013-05-23 12:26:38
Was a volume production mold, not a mould, if simply a die daily output is very low production cycles are longer take lot of artificial. I have applied for to my boss, so we have to bear part of the mold, so this is a die, four a total of 804
|
|
2013-05-23 12:28:18
This is a volume production mold fee, not a die, if only one die daily output is very low, the production cycle is so long, consuming artificial lot. I have applied for to my boss, so we have to bear part of the mold, so this is a die, four a total of 804
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区