|
关注:1
2013-05-23 12:21
求翻译:非互通区的大桥及特大桥采用方案一,单侧预留两车道;天桥、互通区桥梁采用方案二,六车道一次性实施。是什么意思?![]() ![]() 非互通区的大桥及特大桥采用方案一,单侧预留两车道;天桥、互通区桥梁采用方案二,六车道一次性实施。
问题补充: |
|
2013-05-23 12:21:38
Non-exchange area of the bridge and the bridge using the program, and two lanes reserved for unilateral; bridge, the bridge exchange area using the program two, six-lane one-time implementation.
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
The non-intercommunication area bridge and the especially big bridge use the plan one, Shan Ce reserves two traffic lanes; The over-bridge, the intercommunication area bridge use the plan two, six traffic lane disposable implementations.
|
|
2013-05-23 12:26:38
Non-interchange areas of the bridge and the bridge programme, one-sided reserved two lanes; flyover, Exchange area during the second plan, six-lane once implemented.
|
|
2013-05-23 12:28:18
Non-interchange areas of the bridge and the bridge programme, one-sided reserved two lanes; flyover, Exchange area during the second plan, six-lane once implemented.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区