当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:水利水电工程施工总承包叁级: 可承担单项合同额不超过企业资本金5倍的下列工程的施工:库容1000万立方米、装机容量10MW及以下水利水电工程及辅助生产设施的建筑、安装和基础工程施工。工程内容包括:不同类型的大坝、电站厂房、引水和泄水建筑物、通航建筑物基础工程、导截流工程、砂石料生产、水轮发电机组、输变电工程的建筑安装;金属结构制作、安装;压力钢管、闸门制作安装;堤防加高加固、泵站、涵洞、隧道、施工公路、桥梁、河道疏浚、灌溉、排水工程施工。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
水利水电工程施工总承包叁级: 可承担单项合同额不超过企业资本金5倍的下列工程的施工:库容1000万立方米、装机容量10MW及以下水利水电工程及辅助生产设施的建筑、安装和基础工程施工。工程内容包括:不同类型的大坝、电站厂房、引水和泄水建筑物、通航建筑物基础工程、导截流工程、砂石料生产、水轮发电机组、输变电工程的建筑安装;金属结构制作、安装;压力钢管、闸门制作安装;堤防加高加固、泵站、涵洞、隧道、施工公路、桥梁、河道疏浚、灌溉、排水工程施工。
问题补充:

  • 匿名
2013-05-23 12:21:38
Water conservancy and hydropower project construction contract Sanji: You can take a single contract amount not to exceed 5 times the business capital of the following works: capacity of 10 million cubic meters, installed capacity of 10MW and below water conservancy and hydropower projects and suppo
  • 匿名
2013-05-23 12:23:18
Water Conservancy and hydropower engineering construction general contractor : Three levels may assume a single contract amount not to exceed 5 times the enterprise capital following the execution of the works: waterhead 10 million cubic meters, 10 MW installed capacity and the following water conse
  • 匿名
2013-05-23 12:24:58
Water conservation water and electricity project construction primary contractor three levels: May undertake the single item contracted amount not to surpass the enterprise capital in cash 5 time of following projects the constructions: Storage capacity 10,000,000 cubic meter, installed capacity 10M
  • 匿名
2013-05-23 12:26:38
Construction of water conservancy and hydropower project general contract reference level: affordable individual contract amount not more than 5 times the following project of construction of Enterprise Capital Fund: capacity of 10 million cubic meters, 10MW installed capacity and the following cons
  • 匿名
2013-05-23 12:28:18
General contract of hydraulic engineering III level: affordable individual contract amount not over 5 times times the following engineering of enterprise capital construction: volume, capacity of 10MW and below 10 million cubic metre and auxiliary production facility construction, hydraulic engineer
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭