当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Extruder must be complete with all the items in the Scope of the supply (as per annexure 7.1 to 7.6) as detailed in our PO . You must also send the two copies of the Operation and maintenace manual and product Catalogue to us along with the dispatch documents是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Extruder must be complete with all the items in the Scope of the supply (as per annexure 7.1 to 7.6) as detailed in our PO . You must also send the two copies of the Operation and maintenace manual and product Catalogue to us along with the dispatch documents
问题补充:

  • 匿名
2013-05-23 12:21:38
挤出机必须完成在供应范围内的所有项目(如每附上7.1至7.6),详情载于我们的PO。您还必须与分发的文件一起发送的操作和维护保养手册和产品目录“,我们的两个副本
  • 匿名
2013-05-23 12:23:18
挤出机必须是完整的,所有的物品的供应的范围(作为附件7.1至7.6%),详情载於我们埔。 您还必须发出的两份手册的运作及维修和产品目录,我们一直与派兵的文件
  • 匿名
2013-05-23 12:24:58
挤压机在我们的PO一定是完全的与所有项目在供应的范围内(根据annexure 7.1到7.6)如详述。 您必须也送操作和maintenace指南的二个拷贝和产品目录到我们与急件文件一起
  • 匿名
2013-05-23 12:26:38
挤出机必须完成的所有项目范围的详细说明在我们宝 (根据附件 7.1 到 7.6) 供应。此外必须将操作和维护手册和产品目录的两个副本向我们发送连同派单文件
  • 匿名
2013-05-23 12:28:18
挤出机必须完成的所有项目范围的详细说明在我们宝 (根据附件 7.1 到 7.6) 供应。此外必须将操作和维护手册和产品目录的两个副本向我们发送连同派单文件
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭