当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Power supplies for operating the electrified railway shall be obtained from the Public Supply Authority and are transformed at the KTM Bhd Feeder Stations for distribution to the overhead line catenary system. Traction current drawn from the overhead conductor system is returned to the Feeder Station from the overhead 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Power supplies for operating the electrified railway shall be obtained from the Public Supply Authority and are transformed at the KTM Bhd Feeder Stations for distribution to the overhead line catenary system. Traction current drawn from the overhead conductor system is returned to the Feeder Station from the overhead
问题补充:

  • 匿名
2013-05-23 12:21:38
从公共供水单位应当取得经营电气化铁路的电力供应,并转化为架空线接触网系统的分布在KTM BHD直属站。来自架空线系统的牵引电流返回从架空线系统的接驳站,通过运行轨和返回导体。
  • 匿名
2013-05-23 12:23:18
电源供应电气化铁路的运作须取得公众的供应管理局和转变为在result ktm Bhd接驳站,分发至高架线的高架系统。 电车公司案目前来自间接指挥系统的接驳站是返回的间接指挥系统的运行轨道及指挥家返回。
  • 匿名
2013-05-23 12:24:58
电源为操作被使充电的铁路从公开供应当局将获得和被变换在KTM Bhd饲养者驻地为发行对顶上的线悬诉系统。 从顶上的指挥系统得出的牵引潮流返回到饲养者驻地从顶上的指挥系统通过连续路轨和回归指挥。
  • 匿名
2013-05-23 12:26:38
电源供应器电气化的铁路运营须取自公共供应权威和 KTM Bhd 接驳站分发给架空线接触网系统被转换。牵引当前来自架空指挥系统将返回到接驳站从通过运行轨道和返回导线架空的指挥系统。
  • 匿名
2013-05-23 12:28:18
电源供应器电气化的铁路运营须取自公共供应权威和 KTM Bhd 接驳站分发给架空线接触网系统被转换。牵引当前来自架空指挥系统将返回到接驳站从通过运行轨道和返回导线架空的指挥系统。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭