|
关注:1
2013-05-23 12:21
求翻译:管道安装应在泵体找正验收合格,垫铁点焊固定,并且二次抹面结束后方可进行是什么意思?![]() ![]() 管道安装应在泵体找正验收合格,垫铁点焊固定,并且二次抹面结束后方可进行
问题补充: |
|
2013-05-23 12:21:38
1) The pipeline is being installed should find acceptance in the pump, horn fixed spot, and before the end of the second side for wiping;
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
⑸The pipeline installment besides should conform to the present national standards "Industry Metal Plumbing engineering Construction And Approval Standard" the stipulation, still should conform to the following requirement:
|
|
2013-05-23 12:26:38
1) piping should be installed in the pump body alignment check, pad spot-fixed, and only after the end of second hand;
|
|
2013-05-23 12:28:18
1) The pipeline is being installed should find acceptance in the pump, horn fixed spot, and before the end of the second side for wiping;
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区