|
关注:1
2013-05-23 12:21
求翻译:铺贴时,要求面砖平整,镶嵌正确。施工间歇后继续铺贴前,应将已铺贴的花砖挤出的水泥混合砂浆予以清除。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
铺贴时,要求面砖平整,镶嵌正确。施工间歇后继续铺贴前,应将已铺贴的花砖挤出的水泥混合砂浆予以清除。
问题补充: |
|
2013-05-23 12:21:38
Stones, requirements flat tile, mosaic correct. Construction continued intermittently after the Stones before, paving the tiles should have been out of cement mortar to be removed.
|
|
2013-05-23 12:23:18
When asked, stick tile mosaic formation, correct. Construction continued intermittently after shop should be posted before the flowers have been paved and stuck brick extrusion cement mixture mortar be removed.
|
|
2013-05-23 12:24:58
When the shop pastes, requests the face brick to be smooth, the crustification is correct.Front the construction intermittence continues the shop to paste, the cement mix mortar which should which have pasted the decorative brick squeezes out the shop to eliminate.
|
|
2013-05-23 12:26:38
When paving, requiring tile and flat, mosaic is correct. Construction before the batch to continue paving, paving bricks should be extruded cement mortar to clear.
|
|
2013-05-23 12:28:18
Stones, requirements flat tile, mosaic correct. Construction continued intermittently after the Stones before, paving the tiles should have been out of cement mortar to be removed.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区