|
关注:1
2013-05-23 12:21
求翻译:研究实现了测控总体总体方案设计及验证评估系统是什么意思? 待解决
悬赏分:1
- 离问题结束还有
研究实现了测控总体总体方案设计及验证评估系统
问题补充: |
|
2013-05-23 12:21:38
Research and control to achieve the overall assessment of the overall system design and verification
|
|
2013-05-23 12:23:18
The research achievement test and Control Overall overall program design and certification assessment systems
|
|
2013-05-23 12:24:58
The research has realized the observation and control overall overall concept design and the confirmation appraisal system
|
|
2013-05-23 12:26:38
Research to achieve a general plan design and verification of measuring and control overall evaluation system
|
|
2013-05-23 12:28:18
Research and control to achieve the overall assessment of the overall system design and verification
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区